|
Contaminated Land at
Pinchington Lane in Newbury
-
Remediation Consultancy Services
Bettridge
Turner and Partners are supervising a long-term monitoring program
of a landfill site which is producing landfill gases.
The
site was formerly a gravel pit, which was then infilled with waste.
A gas vent trench has been installed along part of the site boundary,
to protect a new adjacent development. This was designed and supervised
by BTP.
BTP have also planned and
supervised ground engineering and a flux box gas survey on part
of the landfill, for which plans in are place to develop it for
a commercial end use. This will enable the design of ground improvement
and gas protection, to allow the development to proceed safely.
more projects
|